Projects

Factory Mezzanine Floors' custom-designed mezzanines take many forms.

Sort by: Products
Sort by: Industry
Challenges

Needed more spare parts storage within an existing live workshop; regional freight delays meant more stock had to be held on site; the second mezzanine...

Solutions

Delivered a second mezzanine for the site, covering 300m² of the existing workshop; included a 2.4m-high perimeter frame fence for added protection around the active...

Challenges

Bar Fridges Australia needed to relocate quickly after their warehouse arrangements became unstable. Their new Ballarat facility gave them a large open footprint, but not...

Solutions
  • Designed, engineered, fabricated and installed a 1,500m² mezzanine floor for the new warehouse
  • Delivered the project under an accelerated programme spanning the Christmas /...
Challenges
  • Create significant new floor area without choking the ground level—clear spans needed for pallet/skid movements and storage.
  • Relocate a busy repair workshop upstairs with...
Solutions
  • Mezzanine set-out sized to ~⅔ warehouse coverage, with approximately three-quarters of the deck wall-mounted to maximise clear space beneath.
  • Load-rated deck engineered for workshop...
Challenges

Relocation to a larger site on a state-controlled arterial road (separate approval pathway beyond council); needed an office-over-production layout with a central staircase that would...

Solutions

Client-signed 3D model to lock scope, geometry, and interfaces pre-fabrication; custom outriggers (“fingers”) and stiffeners welded across primary members to wrap the curved façade, precisely...

Challenges

National road-transport refrigeration group moving into a new facility in a flood-prone area; needed high-capacity storage for heavy palletised spares; required a purpose-built spare parts...

Solutions

45 m × 6 m structural mezzanine for heavy palletised goods; enclosed under-croft with EPS/refrigeration panels to form a dedicated spare parts department; mini roller...

Challenges

Needed more space for spare parts storage to serve regional clients quickly; long freight delays from capital cities.

Solutions

First project: 180 m2 mezzanine for workshop parts. Second project (planned): 500 m2 mezzanine for expanded spare parts storage.

Challenges

Relocating to a new factory; needed large, enclosed production office with clear sightlines; integration with heavy printing equipment.

Solutions

Built tall 400m2 mezzanine with glass walls, dual staircases, motorised pallet gates, hermetically sealed production space; coordinated with other trades for fit-out and load distribution.

Challenges

Ran out of storage space; integrating mezzanine install with arrival of new large-scale printing machine.

Solutions

Multiple mezzanines over time, plus large undercover area for container unloading; staged expansion plan.

Challenges

Raw 600 m2 factory; needed multi-use facility approved by council for critical hospital backup systems.

Solutions

Built two mezzanines (one two-storey), creating workshops, offices, breakout area, and racking; secured fast-track council approval.