Factory Mezzanine Floors' custom-designed mezzanines take many forms.
Factory Mezzanine Floors' custom-designed mezzanines take many forms.
Bar Fridges Australia needed to relocate quickly after their warehouse arrangements became unstable. Their new Ballarat facility gave them a large open footprint, but not...
Need for very high head-room to allow large vans to drive and park beneath the platform; uninterrupted service bays (one van per bay) with minimal...
Mezzanine set-out to create clear-span service bays with posts pushed to bay lines to keep the vehicle footprint free; load-rated deck sized for racked inventory...
Relocation to a larger site on a state-controlled arterial road (separate approval pathway beyond council); needed an office-over-production layout with a central staircase that would...
Client-signed 3D model to lock scope, geometry, and interfaces pre-fabrication; custom outriggers (“fingers”) and stiffeners welded across primary members to wrap the curved façade, precisely...
Tier-one compliance requirements exceeding standard commercial specs (NCC/BCA and client spec for handrail heights, post spacing, tread construction, and certified slip-resistant tactiles); architectural design files...
Design-assist and value-engineering sprint: FMF translated architectural intent into a complete fabrication pack (materials, dimensions, interfaces) to meet spec without overbuilding; custom stair flight set...
Needed more space for spare parts storage to serve regional clients quickly; long freight delays from capital cities.
First project: 180 m2 mezzanine for workshop parts. Second project (planned): 500 m2 mezzanine for expanded spare parts storage.
Relocating to a new factory; needed large, enclosed production office with clear sightlines; integration with heavy printing equipment.
Built tall 400m2 mezzanine with glass walls, dual staircases, motorised pallet gates, hermetically sealed production space; coordinated with other trades for fit-out and load distribution.
Ran out of storage space; integrating mezzanine install with arrival of new large-scale printing machine.
Multiple mezzanines over time, plus large undercover area for container unloading; staged expansion plan.